Cerner - Three Trails Campus
Kansas City, Missouri
Award: 2018 Capstone Award: Special Judges Recognition
Services: Interior Lighting Design, Exterior Lighting Design, Electrical Engineering, Lighting Controls
Architect: Gould Evans
Landscape Architect: Vireo
Cerner Innovations, Building 1024 is the first phase of a multi-phase master planned campus which will cover 4.7 million sq. ft. when fully built out. Building 1024 consists of two office towers that house Cerner’s software development, engineering and IT departments, as well as a low-rise building that will link to future phases and serves dining, and large conference needs. The design integrates numerous visual references to information technology and engineering themes, from the front entry monument signs, to the binary patterns in the perforations of the stainless-steel panels.